| Project |
Year |
Power |
Head |
Services Provided |
| Brignall Mill |
2007 |
3kW |
3m |
Design, manufacture, installation and commissioning of a low-head propeller turbine and control gear. Client: private. |
| Cuckney School |
2007 |
7kW |
4m |
Design, installation and commissioning for a crossflow turbine providing power to the school. Client: Notts County Council. |
| Itteringham Mill |
2006 |
4kW |
1.4m |
Design, manufacture, installation and commissioning of an ultra-low head propeller turbine in siphon layout. Client: private. |
| Hamlyn Mill |
2006 |
7kW |
2m |
Installation and commissioning of siphonic propeller turbine in a disused sluice channel at a Derbyshire mill. Client: private. |
| Marlingford Mill |
2006 |
12kW |
2m |
Refurbishment, system design, installation and commissioning of a 1920s turbine, converted to generate electricity for Marlingford Hall. Client: private. |
| Talamh Life Centre |
2006 |
4kW |
6.5m |
System design, refurbishment, installation and commissioning of a Francis turbine to provide power to a converted farmhouse in Scotland. Client: Talamf Life Centre. |
| Cotton Valley Sewage Works |
2006 |
15kW |
2.6m |
Design, installation and commissioning for a crossflow turbine sited in the final discharge pit at a sewage works, off-setting onsite power consumption. Client: Anglian Water. |
| Guildford Mill |
2005 - 2006 |
40kW |
2m |
Turbine refurbishment, system design, installation and commissioning of a 1930s turbine converted to generate electricity for central Guildford. Client: Guildford Council. |
| Marsh Mill |
2004 - 2005 |
6kW |
1.4m |
System inspection, diagnostic tests and refurbishment for a 1920s turbine at Marsh Mill on the River Thames. Client: private. |
| Sonning Mill |
2004 - 2005 |
16kW |
1.5m |
Design, manufacture, installation and commissioning of an innovative siphonic propeller turbine at a theatre on the River Thames. Client: The Mill at Sonning. |
| Houghton Mill |
2004 |
16kW |
1.2m |
System inspection, diagnostic tests and refurbishment for a very low head scheme. Client: The National Trust. |
| Private domestic Hydro Scheme |
2004 |
10kW |
80m |
Scheme design and installation of Coanda intake, Pelton turbine and control gear for high head domestic scheme. Client: private. |
| Sturston Mill |
2003 |
1.5kW |
3.5m |
Design and build crossflow turbine, supply generator and control system, install and commission. Client: private. |
| Kilmarnock |
2002 |
23kW |
37m |
Specify and supply crossflow turbine, generator and control system for grid connection. Client: private. |
| Oldcotes Mill |
2000 |
3kW |
1.7m |
Design and build waterwheel and control system, supply generator, install and commission. Client: private. |
| Biddulph Park |
2000 |
3kW |
30m |
Specify, supply, install and commission grid connected pelton. Client: Staffordshire Moorlands District Council. |
| Earthbalance Centre |
1999 |
7kW |
13m |
Design, supply, install and grid connect asynchronous crossflow water turbine set. Client: Earthbalance. |
| Belper Mill |
1998 |
350kW |
3.5m |
Upgrade and operate 2 x 175kW grid-connected low-head Gilkes water turbine sets. Client: DHPL. |
| Dolanog Hydro Station |
1998 |
70kW |
7m |
Design and supply two 500mm propeller runners for station upgrade. Client: private. |
| Burton Mill |
1997 |
60kW |
1.2m |
Refurbish two very low head turbines and equip with transmission and generators (one synchronous, one asynchronous), grid-connect and operate. Client: DHPL. |
| Borrowash Mill |
1995 |
100kW |
2.7m |
Design, build, install, grid-connect and operate two 50kW propeller turbine sets. Client: DHPL. |
| Masson Mills |
1994 |
260kW |
3.3m |
Refurbish, grid-connect and maintain 2 synchronous low head Gilkes water turbine sets. Client: Mara Securities. |
| Milford Mill |
1990 |
180kW |
4m |
Refurbish, grid-connect and maintain a 1930s Gilkes low head water turbine. Client: DHPL. |
|