Derwent Hydroelectric Power Limited Home Since the late 1980s we have been actively involved in the refurbishment of old hydro schemes, installation of new schemes and the operation of functional hydro sites. Our area of work is in the range 1kW to 1MW peak electrical output with heads of 1.5 to 150 meters and flows of 20 to 20,000 litres per second. Some of the equipment we use and supply is designed and built in-house and some is sourced externally, depending on the requirements of the particular site. Whether you know of a disused hydro scheme in need of attention or are interested in installing a new scheme from scratch we would be pleased to hear from you. We believe passionately that water power resources should be used wherever possible and appropriate. We are always pleased to be involved in projects aiming to do this. |
|